You cannot select more than 25 topics Topics must start with a letter or number, can include dashes ('-') and can be up to 35 characters long.
git-secret/vendor/bats-core/docs/source/usage.md

95 lines
3.3 KiB
Markdown

# Usage
Bats comes with two manual pages. After installation you can view them with `man
1 bats` (usage manual) and `man 7 bats` (writing test files manual). Also, you
can view the available command line options that Bats supports by calling Bats
with the `-h` or `--help` options. These are the options that Bats currently
supports:
``` eval_rst
.. program-output:: ../../bin/bats --help
```
To run your tests, invoke the `bats` interpreter with one or more paths to test
files ending with the `.bats` extension, or paths to directories containing test
files. (`bats` will only execute `.bats` files at the top level of each
directory; it will not recurse unless you specify the `-r` flag.)
Test cases from each file are run sequentially and in isolation. If all the test
cases pass, `bats` exits with a `0` status code. If there are any failures,
`bats` exits with a `1` status code.
When you run Bats from a terminal, you'll see output as each test is performed,
with a check-mark next to the test's name if it passes or an "X" if it fails.
```text
$ bats addition.bats
✓ addition using bc
✓ addition using dc
2 tests, 0 failures
```
If Bats is not connected to a terminal—in other words, if you run it from a
continuous integration system, or redirect its output to a file—the results are
displayed in human-readable, machine-parsable [TAP format][https://testanything.org].
You can force TAP output from a terminal by invoking Bats with the `--formatter tap`
option.
```text
$ bats --formatter tap addition.bats
1..2
ok 1 addition using bc
ok 2 addition using dc
```
With `--formatter junit`, it is possible
to output junit-compatible report files.
```text
$ bats --formatter junit addition.bats
1..2
ok 1 addition using bc
ok 2 addition using dc
```
Test reports will be output in the executing directory, but may be placed elsewhere
by specifying the `--output` flag.
```text
$ bats --formatter junit addition.bats --output /tmp
1..2
ok 1 addition using bc
ok 2 addition using dc
```
## Parallel Execution
``` eval_rst
.. versionadded:: 1.0.0
```
By default, Bats will execute your tests serially. However, Bats supports
parallel execution of tests (provided you have [GNU parallel][gnu-parallel] or
a compatible replacement installed) using the `--jobs` parameter. This can
result in your tests completing faster (depending on your tests and the testing
hardware).
Ordering of parallised tests is not guaranteed, so this mode may break suites
with dependencies between tests (or tests that write to shared locations). When
enabling `--jobs` for the first time be sure to re-run bats multiple times to
identify any inter-test dependencies or non-deterministic test behaviour.
When parallelizing, the results of a file only become visible after it has been finished.
You can use `--no-parallelize-across-files` to get immediate output at the cost of reduced
overall parallelity, as parallelization will only happen within files and files will be run
sequentially.
If you have files where tests within the file would interfere with each other, you can use
`--no-parallelize-within-files` to disable parallelization within all files.
If you want more finegrained control, you can `export BATS_NO_PARALLELIZE_WITHIN_FILE=true` in `setup_file()`
or outside any function to disable parallelization only within the containing file.
[gnu-parallel]: https://www.gnu.org/software/parallel/