You cannot select more than 25 topics Topics must start with a letter or number, can include dashes ('-') and can be up to 35 characters long.
OpenTTD-patches/regression
Patric Stout aac8c28d73 Fix #7656: destroying a tunnel/bridge now first removes the tracks for cost calculation
This means that for rail tunnel/bridges, the rail is first sold,
and the tunnel/bridge is destroyed after. This means destroying
tunnels/ bridges now often makes you money, instead of costing.

Similar, with road/tram tracks. Destroying a road+tram
tunnel/bridge now costs the same amount of money as first
removing the tram tracks and than destroying the road
tunnel/bridge. Especially as tram tracks generate money when
removing, this is a noticeable difference.
3 years ago
..
regression Fix #7656: destroying a tunnel/bridge now first removes the tracks for cost calculation 3 years ago
stationlist Codechange: move regression outside of bin and make it work via CMake script 4 years ago
regression.cfg Codechange: move regression outside of bin and make it work via CMake script 4 years ago