Linkgraph: Reduce job duration multipliers

Change to linear: size / 75
Remove knee in curve
pull/461/head
Jonathan G Rennison 2 years ago
parent ad815210ae
commit 24b3e70494

@ -39,9 +39,7 @@
* The cost budget for an individual call to this method is given by U / S.
* The last scheduled job may exceed the cost budget.
*
* For jobs where N <= 1600, the nominal duration of an individual job is D = N / 40
* For jobs where N > 1600, the nominal duration of an individual job is D = 40 * C / C(1600)
* Overall D(N) is linear up to N=1600, then ~N^2 log N
* The nominal duration of an individual job is D = N / 75
*
* The purpose of this algorithm is so that overall responsiveness is not hindered by large numbers of small/cheap
* jobs which would previously need to be cycled through individually, but equally large/slow jobs have an extended
@ -80,7 +78,7 @@ void LinkGraphSchedule::SpawnNext()
uint64 cost = lg->CalculateCostEstimate();
used_budget += cost;
if (LinkGraphJob::CanAllocateItem()) {
uint duration_multiplier = lg->Size() <= 1600 ? CeilDivT<uint64_t>(lg->Size(), 40) : CeilDivT<uint64_t>(40 * cost, 108993087);
uint duration_multiplier = CeilDivT<uint64_t>(lg->Size(), 75);
std::unique_ptr<LinkGraphJob> job(new LinkGraphJob(*lg, duration_multiplier));
jobs_to_execute.emplace_back(job.get(), cost);
if (this->running.empty() || job->JoinDateTicks() >= this->running.back()->JoinDateTicks()) {